135MW FGD for Qianqing Power Plant
|
|||||||||||||
|
135MW FGD for Qianqing Power Plant
|
|||||||||||||
Qianqing Power Plant 135MW Unit FGD Project General Contract
General Statement
Qianqing Power Plant locating at Qianqing, Shaoxing, Zhejiang
Province, has one 125MW unit and one 135MW unit.125MW unit adopts
LIFAC process in low desulfurization efficiency. For higher
efficiency 135MW unit uses limestone-gypsum wer technology. 135MW
unit FGD works lasted 18 months from pile drilling to successful
168 hours full-load trial operation, and it is the first FGD
project generally contracted by our Company, and is also the first
in-operation wet FGD project generally contracted by domestic
companies.It successfully passed 168 hours full-load trial
operation on July 2, 2003. All performances have been being
excellent since put into operation.
Process System
Adopting limestone-gypsum wet FGD technology of the USA B&W
Company, with 7 process systems and DCS control.
FGD Waste Water Treatment System Flow Chart
Qianqing FGD Waste Water Treatment System is the first one whose
main equipment is homemade. Upon site practice, the out water
quality reaches the national waste water emission standard, with
some items reaching the internation FGD waste water emission
standard of the same type.
Performance Test
All indexes are better than guaranteed values in the Contract.
Item | Guaranteed Value | Actual Value | Condition description Sar=1.06~1.4% 50%~100%BMCR CaCO3 purity 92.75% Two levels of sprayer -----data from monitori -ng and performance test report of Zhejiang Environment Monitoring Station and Zhejiang Ele -ctric Power Test and Re -search Institute |
SO2removal rate | ≥90% | 92.7%~93.3% | |
Ca/S | ≤1.03 | 1.01--1.03 | |
FGD out gas temperature | >80℃ | 85.6~88.9℃ | |
FGD system damage due to pressing | ≤3035Pa | 2300~2610Pa | |
Consumption of process water | ≤37m3/h | 1 |